      Abstract: The U.S. invention patent led by Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd., Lifting and Reinforcing Process for Dust-Free Factory Floor (Chinese title: A Lifting and Reinforcement Process for Dust-Free Factory Floors, International Application No. PCT/CN2023/079305), addresses the problem of dust generation and secondary contamination during settlement remediation in cleanrooms through an enclosed lifting process using rubber bladders. The technology has been applied in benchmark precision workshops in the aerospace industry. Supported by its overseas branches, the company is capable of providing global solutions for foundation settlement problems under complex geological conditions worldwide.

      I. The Challenge: Dust Is a Critical, Non-Negotiable Issue in Precision Manufacturing Facilities

      Facilities in aerospace, electronics, new energy, and other high-precision industries are often designed as cleanrooms. When uneven floor settlement occurs, conventional repair methods involving drilling equipment typically require holes to be drilled through the floor.

      Dust generated by drill bits, as well as dust escaping from grouting equipment, may enter the workshop through drilled holes, gaps left after hole sealing, and cracks in the underlying soil. Conventional methods can only address dust after construction through subsequent cleaning operations. This not only incurs substantial costs but also fails to meet the stringent requirements of precision equipment, where cumulative contamination must be avoided.

      Dust contamination has therefore become a key constraint in the remediation of floors in dust-free manufacturing facilities.

      II. Patented Process: Two Coordinated Steps Without Compromising the Integrity of the Facility

      This U.S. invention patent divides the process into two steps.

      Step 1: Reinforcement of Weak Soil. Stable consolidated soil bodies are formed within weak soil layers beneath the settlement-affected area, increasing the foundation bearing capacity to the required design level.

      Step 2: Precision Lifting of the Settled Area. The settled area is precisely lifted without compromising the integrity of the existing floor structure. Rubber bladders are used to create enclosed chambers that confine the grout within the designated lifting area, concentrating and releasing upward lifting force. This prevents ineffective grout dispersion into the surrounding soil, avoids disturbing adjacent soil layers, and prevents unintended changes in the elevation of surrounding floor areas.

      Upon completion of the coordinated two-step process, the floor is restored to its designed elevation while maintaining its structural integrity, preventing external dust from entering the cleanroom at its source.

      III. Core Advantages: Precision Lifting for Dust-Free Manufacturing Facilities

      • Fully Enclosed and Integrated Process: All reinforcement and lifting operations are completed within the underlying soil layers without breaking or dismantling the existing floor, preventing external dust from entering the facility at its source.

      • Directional Lifting with Rubber Bladders: Rubber bladders serve as enclosed chambers to confine grout within the designated lifting area, preventing ineffective lateral dispersion and ensuring that lifting force is precisely transferred to the settled floor.

      • Elimination of Secondary Dust-Cleaning Operations: The floor structure remains intact throughout the process, eliminating the need for secondary, facility-wide dust cleaning after conventional repair work.

      • Designed for International Precision Manufacturing Facilities: The process integrates non-destructive, controllable soil solidification technology and uses micro-borehole operations with diameters of 6–10 mm. Combined with an intelligent real-time monitoring system, it enables millimeter-level control and can be adapted to international cleanroom standards for aerospace, electronics, and semiconductor industries.

      IV. Project Application: Floor Remediation Completed in 20 Days at a Precision Workshop of a World-Renowned Aircraft Manufacturer

      A precision workshop at a world-renowned aircraft manufacturing facility experienced differential settlement, with a maximum settlement of 46 mm and floor voids measuring 30–50 mm.

      The geological conditions consisted primarily of plain fill, hydraulic fill, muddy silty clay, and muddy clay. The foundation soil had low bearing capacity and exhibited significant creep deformation. The facility was supported by pile foundations and had extremely stringent cleanliness requirements.

      Hengxiang Hongye implemented the patented lifting and reinforcement process in combination with its non-destructive, controllable soil solidification technology. The settled areas were precisely lifted, forming a dual load-bearing system beneath the floor consisting of a “raft-shaped composite ground foundation” and a “composite pile foundation.”

      The entire process was carried out without breaking or dismantling the existing floor. Directional, precision lifting was performed in conjunction with an intelligent monitoring system to achieve millimeter-level control and adjustment.

      The project was completed in just 20 days, with a maximum floor lifting of 46 mm, and passed acceptance inspection in a single attempt.

      Client Feedback: “The workshop continued operating normally throughout construction. There was no dust and no need for subsequent dust-cleaning operations. The floor lifting results were clearly visible, and we were highly satisfied with the overall outcome.”

      V. Intellectual Property and Global Expansion: International Patents Supporting Worldwide Remediation Capabilities

      Hengxiang Hongye, the patent holder, is an industry-academia-research partner of China University of Geosciences (Beijing) and China University of Mining and Technology (Beijing). Its key technologies have undergone evaluation by the Ministry of Science and Technology and have been rated as “internationally advanced overall, with certain aspects reaching an internationally leading level” (Certificate No. 202311ZK7875).

      The company is actively advancing its international expansion and global intellectual property strategy. It has accumulated a total of 148 domestic and international patent applications and granted patents, including 32 international patents (both pending applications and granted patents). It has published 14 academic papers, 9 of which are indexed by SCI.

      The company has established in-depth partnerships with multinational corporations such as Mercedes-Benz, 3M, and Nestlé, as well as leading domestic companies including CATL, Geely, and Haier.

      Its overseas operations span multiple countries worldwide. Its proprietary technologies are adaptable to complex geological conditions, including karst, collapsible loess, muddy soils, and deep fill soils, enabling the company to provide solutions to foundation settlement challenges worldwide.

      VI. Looking Ahead

      As precision manufacturing facilities continue to impose increasingly stringent cleanliness requirements, this patent transforms settlement remediation from a reactive effort to combat contamination into precision engineering designed to protect clean manufacturing environments.

      In the future, Hengxiang Hongye will leverage this patent, its non-destructive and controllable soil solidification technology, and its global network of overseas offices to bring non-destructive floor lifting and reinforcement solutions to manufacturing facilities worldwide where dust contamination is unacceptable, ensuring long-term floor stability for aircraft assembly facilities and electronic cleanrooms.